The group started arriving at 8am. Due to the size of the building, three bents were assembled on Friday and work started quickly a little after 8:30.
Brendan is up top in the tie dye.
Take a look at the long beams across the length. Each is two pieces held together with a scarf joint. The larger portion of the beam was 28' and went up two stories with the help of 30-40 sets of hands. The smaller portion was only 20'. The last tenons are set before lunch.